Vue Cinema Rotunda
Having completed the pre-acquisition survey, Trident’s Bristol office team were instructed to prepare a planned preventative maintenance survey and subsequently project manage the roof covering replacement works for The City Gates on behalf of the Landlord. The site is mixed-use and comprises a cinema, hotel, various restaurants, bars and some office space. Shortly after issuing […]
Three Kings Court
The main roof at Kings Court was a torched, clay pan tile roof with lead valleys and leadwork detailing throughout. The roof was estimated at over one hundred years old. The clay pan tiles were generally in poor condition with widespread patch repairs. Replacement of the lime torching was considered, however, conservation specialists advised that […]
Unit M, Stover Trading Estate
Trident’s Bristol office was appointed by Royal London Asset Management in April 2019 to act as Contract Administrator and CDM Principal Designer for the full refurbishment of the 6No terraced warehouse units which included demolition of the welfare block at the front of each unit. A comprehensive specification was prepared and competitively tendered by Trident […]
Unit B, Stover Trading Estate
Trident’s Bristol office was initially appointed by Royal London Asset Management in December 2018 to undertake a Terminal Dilapidations Schedule on a 11,159 ft² light industrial warehouse unit following the expiry of the Tenants lease. Trident then successfully negotiated a full and final cash settlement sum from the Tenant. Trident was then appointed as Contract […]
Unit 22, Nuffield Way
Trident’s Bristol office was appointed by CBRE Global Investors to act as Contract Administrator and CDM Principal Designer in the clean-up and refurbishment of 9,000 ft² light industrial warehouse unit following a significant fire to the property in. Trident reacted quickly to inspect and coordinate the cleanup of the building which included a specialist clean […]
Unit 25, Nuffield Way
Trident’s Bristol office was initially appointed by CBRE Global Investors in June 2019 to undertake a Terminal Dilapidations Schedule on a 11,540 ft² light industrial warehouse unit following the expiry of the Tenants lease. Trident then successfully negotiated a full and final cash settlement sum from the Tenant. Trident was then appointed as Contract Administrator […]
Longcross
Trident was appointed to provide project management services to assist Picton in terms of undertaking a number of refurbishment packages and energy performance improvement works to this large, detached office building located within Cardiff City Centre. The works included the removal of gas fired systems in favour of new “all electric” building services. This included […]
2 Kingsway
Trident’s Bristol office undertook the initial technical due diligence at pre-acquisition stage on behalf of our client. The building was purchased with vacant possession with the intention of undertaking an extensive refurbishment. Trident was subsequently appointed as the client’s lead consultant (Project Managers). Trident assembled an extensive project/design team and successfully project managed the refurbishment from […]