Trident acted as Contract Administrator and CDM Principal Designer on this CAT A refurbishment of the Parkhead Corps and community centre for The Salvation Army.
The works included replacement of the existing flat roofs with a built up felt system and increase insulation, stonework repairs/refurbishment, general internal refurbishment of decoration, upgrade to LED light fittings and replacement of floor coverings. The existing heating and hot water systems were also upgraded.