Parkhead Corps

Trident acted as Contract Administrator and CDM Principal Designer on this CAT A refurbishment of the Parkhead Corps and community centre for The Salvation Army.

The works included replacement of the existing flat roofs with a built up felt system and increase insulation, stonework repairs/refurbishment, general internal refurbishment of decoration, upgrade to LED light fittings and replacement of floor coverings. The existing heating and hot water systems were also upgraded.

Client
The Salvation Amry
Sector
Third Sector
Our Role
Key Issues
  • Full design and specification
  • Obtaining of statutory consents for removal of existing roofs and replacement
  • Coordination with mechanical engineer to implement new heating and hot water systems