Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Building Surveying, Project Management

Unit 22, Nuffield Way

Trident’s Bristol office was appointed by CBRE Global Investors to act as Contract Administrator and CDM Principal Designer in the clean-up and refurbishment of 9,000 ft² light industrial warehouse unit following a significant fire to the property in.

Trident reacted quickly to inspect and coordinate the cleanup of the building which included a specialist clean internally and externally due to extensive fire damage to the asbestos cement sheet roof. Trident coordinated the appointment of a structural engineer to asses any potential structural damage to the building. As a result, a significant section of the rear elevation wall had to be rebuilt due to damage caused by the fire. Specialist testing of the steel frame was also undertaken by Sandberg although no significant damage was identified.

A comprehensive specification was prepared and competitively tendered by Trident which included a new composite sheet roof and cladding, new roller shutter door, and a specialist soda clean internally followed by a full internal refurbishment including the installation of new LED lighting and sanitaryware.

Throughout the project, Trident liaised closely with the building insurance Loss Adjuster to ensure all construction costs and professional fees were fully recovered through the insurance.

Client
CBRE Investment Management
Sector
Industrial
Our Role
Key Issues
  • Significant fire damage to the industrial unit following a large fire in the unit in July 2019
  • Coordinated the immediate clean-up of the building internally and externally due to extensive damage to the asbestos cement sheet roof
  • Coordinated a structural engineer to survey the property and assess damage to the structure (including specialist testing of the steel frame by Sandberg)
  • Management of the refurbishment works through a JCT Intermediate with Contractors Design 2016 Building Contract
  • Regular liaison with the building insurance Loss Adjuster to ensure 100% recovery of all construction costs and professional fees
  • Coordinated the reinstatement of the original electrical supply to the building by SSE
  • Review of the Tenants Leasehold reinstatement obligations and assessment of their financial contribution to the strip out costs